PagerDuty

A fast-track Design & Build project that demonstrates how thoughtful design and seamless delivery can move together.

Modern kitchen area featuring a wooden island with a plant centerpiece, four stools, and a wall-mounted screen, surrounded by green and wooden accents.

PagerDuty

Completed in ten weeks, the new London workplace gives PagerDuty a flexible, high-quality home for its growing UK team.

PagerDuty’s continued growth called for a London workplace designed to support its expanding UK team, bringing together focused work, collaboration and social space within a new 6,000 sq ft environment at Eden House, Liverpool Street. 

Appointed through long-standing partner Facilitate, following the successful delivery of Xero in 2025, AIS transformed a newly refurbished Cat A floor into PagerDuty’s first significant UK office. 

Studio Pringle developed the concept through RIBA Stage 3, with AIS progressing the scheme through Stages 4 and 5 as a Design & Build project. Designed for 50–55 people, the workplace includes 50 workstations, six meeting rooms, five phone booths and two tea points. A central staircase connects the sixth and seventh floors, with a flexible town hall and private terrace providing space for collaboration and events. 

Delivered in just ten weeks while construction continued elsewhere in the building, the project required close coordination across design, procurement and construction. AIS worked with Studio Pringle, Facilitate and the wider supply chain to resolve evolving bespoke joinery, acoustic treatments and detailing while protecting the original design intent. 

  • Size

    6000 sq ft

  • Completed

    2026

The workplace reflects PagerDuty’s identity through materiality rather than graphics. Bold yellow credenzas punctuate key spaces, while green and blue acoustic panels introduce colour, texture and improved acoustic performance throughout the meeting rooms. Bespoke timber joinery, oversized doors and carefully detailed finishes give the workplace a sense of permanence that elevates it beyond a conventional Cat B fit-out. 

Circulation is central to the experience of the space. A new staircase connects the sixth and seventh floors, allowing the workplace to function as one cohesive environment rather than two separate levels. The upper floor includes a flexible town hall and event space equipped with integrated AV technology, alongside a generous tea point and access to a private balcony terrace overlooking the City. 

Across the workplace, six meeting rooms, a dedicated boardroom, five phone booths and a variety of collaborative settings create an environment that supports focused work, connection and future growth in equal measure. 

Momentum that lasts 

Completed in June 2026, the project delivered a workplace that remained true to the original design vision while meeting an ambitious programme. Early feedback from PagerDuty, the project team and delivery partners reflects a successful collaboration and a smooth transition into occupation. 

The project also marks the second successful collaboration between AIS and Facilitate. As Facilitate continues to grow its presence in the UK, projects such as PagerDuty demonstrate the value of trusted partnerships built on shared ambition, clear communication and the ability to keep complex projects moving. 

  • A modern hallway featuring curved, illuminated walls in shades of blue and green, with a wooden herringbone floor and a visible sign for "PagerDuty.
  • Modern kitchen area featuring a wooden island with a plant centerpiece, four stools, and a wall-mounted screen, surrounded by green and wooden accents.
  • Modern office interior featuring a staircase, seating areas, and greenery, with large windows allowing natural light.

Quotes

What our clients say
  • The best projects are built on strong partnerships. Working alongside Facilitate, Studio Pringle and PagerDuty, there was a shared commitment to finding solutions, maintaining quality and keeping the project moving. That collaborative approach allowed us to deliver a workplace that reflects the original vision while meeting an ambitious programme.

    Adam Douglas Project Director AIS