- Projects
- London
8 Old Jewry
Creating a tenant ready space delivering a return on investment for the landlord
-
Location
-
Sector
-
Service
Our ongoing relationship with the client, which began in 2024, has seen us successfully deliver multiple projects within the building, including the 5th, 2nd and most recently the 7th floor. Following the strong leasing success of the 5th floor Cat A+ refurbishment, we were appointed to undertake a full strip-out and Cat A and B fit-out to the 7th floor, creating a high-quality workspace designed to maximise return on investment and attract new tenants.
The design draws on blending collaborative and social spaces with a strong ESG focus through the use of innovative, durable and sustainable materials. Intelligent coordination of joinery and furniture ensured a cost-effective yet considered solution. Delivered within a 14-week programme, the space will soon be occupied, with our Client Services team supporting the tenant with Day 2 enhancements as they tailor the workplace to their needs.
Environmental, Sustainability and Governance
Our design approach centred around sourcing and integrating new and innovative materials that are eco-friendly, responsibly made and durable. All of our specified appliances and mechanical and electrical installations are energy efficient and surpass minimum EPC requirements. The intention is to create a space that sets a benchmark within the market for ESG standards in commercial real estate.
Client challenges
Achieving strong ROI while repositioning vacant space in a competitive leasing market.
Delivering a high-quality, ready-to-occupy workspace that would attract tenants quickly and reduce void periods.
Balancing ESG ambitions and cost control within a 14-week programme.
Transformational impact
Created a plug-and-play Cat A and B workspace that accelerated tenant interest and occupation.
Enhanced the building’s appeal through collaborative, social and ESG-led design features.
Strengthened a trusted, ongoing partnership, supporting leasing success and future adaptability through Day 2 works.
-
Size
12,748 sq ft
-
Completed
2026